BATH, Maine -- The largest destroyer ever built for the U.S. Navy headed out to sea for the first time Monday, departing from shipbuilder Bath Iron Works and carefully navigating the winding Kennebec River before reaching the open ocean, where the ship will undergo sea trials.
More than 200 shipbuilders, sailors and residents gathered to watch as the futuristic 600-foot, 15,000-ton USS Zumwalt glided past Fort Popham, accompanied by tugboats.
Kelley Campana, a Bath Iron Works employee, said she had goose bumps and tears in her eyes.
"This is pretty exciting. It's a great day to be a shipbuilder and to be an American," she said. "It's the first in its class. There's never been anything like it. It looks like the future."
Larry Harris, a retired Raytheon employee who worked on the ship, watched it depart from Bath.
"It's as cool as can be. It's nice to see it underway," he said. "Hopefully, it will perform as advertised."
Bath Iron Works will be testing the ship's performance and making tweaks this winter. The goal is to deliver it to the Navy sometime next year.
"We are absolutely fired up to see Zumwalt get underway.
For the crew and all those involved in designing, building, and readying this fantastic ship, this is a huge milestone," the ship's skipper, Navy Capt. James Kirk, said before the ship departed.
The ship has electric propulsion, new radar and sonar, powerful missiles and guns and a stealthy design to reduce its radar signature.
Advanced automation will allow the warship to operate with a much smaller crew size than current destroyers.
All of that innovation has led to construction delays and a growing price tag. The Zumwalt, the first of three ships in the class, will cost at least $4.4 billion.
Connect with the Southeast Missourian Newsroom:
For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.