Highway 34 in Bollinger County, from Route ZZ to a mile east of Route ZZ, will be reduced to one lane with an 11-foot width restriction as contractor crews tie the new roadway to the old roadway. Temporary signals will be in place to direct traffic. The work will begin at 7 a.m. June 3 and should conclude by 6 p.m June 6.
All work is weather permitting. Work zones will be marked with signs. Motorists are urged to use caution while traveling near those areas. For more information, contact MoDOT's Customer Service Center at 888-275-6636, or visit modot.org/southeast.
-- From the Missouri Department of Transportation
Connect with the Southeast Missourian Newsroom:
For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.