ST. LOUIS (AP) - Sen. Roy Blunt is threatening to block confirmation of the next Environmental Protection Agency administrator unless the federal government moves forward with a flood control project in southeast Missouri.
The St. Louis Post-Dispatch (http://bit.ly/Y9aLeG ) reports the Missouri Republican and his Democratic colleague, Claire McCaskill, want resolution of the long-delayed St. John's Bayou/New Madrid Floodway project. The project would build a quarter-mile levee and install infrastructure to protect farmland and small towns from the Mississippi River.
The project has been delayed for six years over environmental rules. Blunt accused the EPA of what he called "outrageous" efforts to stand in the way of the project.
___
Information from: St. Louis Post-Dispatch, http://www.stltoday.com
Copyright 2013 The Associated Press.
Connect with the Southeast Missourian Newsroom:
For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.