custom ad
NewsOctober 25, 2016

The motor vessel Blake Denton of Marquette Transportation pushes a tow Monday down the Mississippi River across from Trail of Tears State Park in Jackson. Behind it is a river-training structure, or rock dike, being constructed by the U.S. Army Corps of Engineers. Rock dikes use the river's energy to move sand out of the channel, reducing the need for dredging...

story image illustation
Fred Lynch
Receive Daily Headlines FREESign up today!

The motor vessel Blake Denton of Marquette Transportation pushes a tow Monday down the Mississippi River across from Trail of Tears State Park in Jackson. Behind it is a river-training structure, or rock dike, being constructed by the U.S. Army Corps of Engineers. Rock dikes use the river's energy to move sand out of the channel, reducing the need for dredging.

Story Tags

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!