custom ad
NewsMarch 26, 2008

The proposed parks and storm-water tax issue would fund the following 12 storm-water abatement projects: n Detention and runoff control at Arena Creek Park, along Optimist Drive, and at Lisa Street retention basin n Channel stabilization at Breckenridge Branch and the Dorothy Street drainage area...

The proposed parks and storm-water tax issue would fund the following 12 storm-water abatement projects:

  • Detention and runoff control at Arena Creek Park, along Optimist Drive, and at Lisa Street retention basin
  • Channel stabilization at Breckenridge Branch and the Dorothy Street drainage area

Street flooding

n Cape Rock Drive at Scivally Park

  • Themis Street at Silver Springs Road
  • Howell Street at Scivally Fork
  • Margaret and Janet streets
  • 2400 block of Melrose Street
Receive Daily Headlines FREESign up today!

Replacement and repair

n Merriwether drainage tunnel

  • Beaver Creek retention basin

Flood control

n LaSalle retention basin flood monitor

SOURCE: city of Cape Girardeau

Story Tags

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!