custom ad
NewsAugust 19, 2008

The Ditch 35 Bridge on Route W between Oran and Perkins is scheduled to reopen Wednesday, weather permitting. The bridge was closed in March, immediately after a historic 13-inch rain. Flooding wore a hole in the road and washed out some of the bridge pilings...

Southeast Missourian
KIT DOYLE ~ kdoyle@semissourian.com, file
The Ditch 35 Bridge on Route W between Oran and Perkins will reopen Wednesday. It was closed in March for repair of damage caused by storms.
KIT DOYLE ~ kdoyle@semissourian.com, file The Ditch 35 Bridge on Route W between Oran and Perkins will reopen Wednesday. It was closed in March for repair of damage caused by storms.

The Ditch 35 Bridge on Route W between Oran and Perkins is scheduled to reopen Wednesday, weather permitting.

The bridge was closed in March, immediately after a historic 13-inch rain. Flooding wore a hole in the road and washed out some of the bridge pilings.

"Drivers have been detoured until we could get a contract in place to replace the bridge with a safe structure," said MoDOT engineer Brian Holt. "We are very appreciative of their patience and happy the contractor could make the repairs more quickly than expected."

The single-span concrete bridge is nearly 59 feet long and has steel rails.

Receive Daily Headlines FREESign up today!

Holt said the new bridge is designed so that "there should be no problems of this bridge being damaged by future floods."

He said the bridge is used by school buses and by farmers who need to transport crops and supplies.

Repairs cost $233,000. A.E. Simpson Construction of Scott City did the work, he said.

For more information, call MoDOT at 888-275-6636.

Story Tags
Advertisement

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!