SIKESTON, Mo. -- Work to replace the Route EE bridge over the Little River Drainage Ditch No. 1 in Scott County is expected to begin May 9, weather permitting. The road will remain closed from Highway 25 to Highway 77 as construction continues. Completion is anticipated in mid-July. Signs and warning devices will be in place, and motorists are urged to use extreme caution while traveling near the area. For more information, contact regional field engineer Andy Meyer at 573-472-5296, assistant resident engineer David Wyman at 573-840-9781, 888-275-6636, or visit www.modot.org/southeast/safeandsound.htm. 
Connect with the Southeast Missourian Newsroom:
For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.