custom ad
NewsMay 30, 2012

SIKESTON, Mo. -- U.S. 60 will be reduced to one lane with a 12-foot width restriction, between the Business Route 60 intersection and Highway 114, as contractor crews begin pavement resurfacing. Weather permitting, work will be done Monday through June 29, from 6 a.m. ...

Southeast Missourian
Receive Daily Headlines FREESign up today!

SIKESTON, Mo. -- U.S. 60 will be reduced to one lane with a 12-foot width restriction, between the Business Route 60 intersection and Highway 114, as contractor crews begin pavement resurfacing. Weather permitting, work will be done Monday through June 29, from 6 a.m. to 6 p.m. daily. The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area. For more information, contact resident engineer Brian Holt at 243-0899 or MoDOT's at 888-275-6636 or visit www.modot.org/southeast.

Story Tags
Advertisement

Connect with the Southeast Missourian Newsroom:

For corrections to this story or other insights for the editor, click here. To submit a letter to the editor, click here. To learn about the Southeast Missourian’s AI Policy, click here.

Advertisement
Receive Daily Headlines FREESign up today!