[SeMissourian.com] Fair ~ 92°F  
Heat Advisory
Friday, Aug. 22, 2014

City of Cape Girardeau permit status report for September

Tuesday, October 15, 2002

Following is the September permit status of new buildings, expansions and remodeling projects and the status of those projects in Cape Girardeau:

New buildings

Americare Properties, Inc.; new residential care facility; needs address.

Chap Arnold Insurance; 875 N. Kingshighway; applied 9-25-02.

The Bank of Missouri; 3427 William St.; applied 9-23-02.

La Croix United Methodist Church; phase 3; mobile office trailer; 3102 Lexington Ave.; ready 9-23-02; issued 10-1-02.

Shamrock Circle Triplex; 2969, 2971, 2973 Shamrock Circle; garages; letter sent, 9-20-02; revisions, 9-24-02; ready, 9-25-02; issued 9-25-02.

Dr. Braxton, 3912 Taxiway A; new airplane hangar; needs address, 8-21-02; needs structural calculations and plans, 9-19-02; structural calculations and plans 9-27-02; ready, but still needs new address; issued 10-08-02.

First Community Bank, 21 S. Mount Auburn Road, new building, needs address, letter sent 9-09-02, needs truss calculations, 10-07-02.

Christ Church of the Heartland, 709 Bertling St., utility building, needs site plan and construction documents, site plan 7-19-02, revisions 8-8-02, needs truss calculations 8-09-02.

Rebel Group, Station West Strip Center, 623 S. Silver Springs Road, new strip mall, preliminary site plan 9-4-01, sent set of plans to fire department 6-5-02, structural calculations 6-17-02, needs water calculations 6-24-02, issued footing and foundation 6-28-02, structural drawings 7-30-02, shell ready 7-30-02, issued shell 7-31-02, final documents 9-19-02, letter sent 10-1-02, revisions 10-14-02.

A-1 Mini-Storage, 1857 Rusmar Ave., storage building, needs subdivision approval, needs address, revisions 7-9-02, needs plumbing plans 7-18-02, letter sent 8-5-02, revisions 8-22-02, letter sent 9-6-02, revisions 9-19-02, revisions 9-25-02, ready 10-1-02, issued 10-8-02.

Alamosa PCS Tower, 2215 Broadway, new cell phone tower, needs special use permit, letter sent 2-13-02.

Additions and remodeling

St. Francis Medical Center, cooling towers, central plant phase 3, 211 St. Francis Dr., exterior remodel.

Kellerman-Alliance Building, interior remodel, 17A, 17B, and 19 S. Spanish St.

Rent One, interior remodel, 610 S. Kingshighway, site plan 10-8-02, electrical plan 10-9-02.

Montessori School, exterior remodel, 418 Independence St., revisions, 10-3-02, ready 10-3-02.

The White House, interior remodel, 820 N. Sprigg, revisions 9-12-02, letter sent 9-17-02.

Seyer Garage, addition, 2334 Rusmar St., ready 9-19-02, issued 9-30-02.

St. Francis Medical Center, master plan phase 2, 211 St. Francis Drive, interior remodel, ready 10-11-02.

Wet Seal, interior remodel, 3049 William St., space 253, letter sent 9-18-02, revisions 10-4-02, ready 10-7-02.

Concord Publishing, printshop addition, 500 William St., mechanical and electrical plans 8-22-02, revisions 9-13-02, issued footing and foundation 9-17-02, structural plans 9-17-02, shell and interior ready 10-03-02, issued shell and interior 10-8-02.

Plaza Tire Service Inc., exterior remodel, 2149 William St., on hold.

R.M. Coco, interior remodel, 1389 Southern Expressway, addendum no. 1 8-28-02, letter sent 9-18-02, revisions 9-25-02, revisions 10-4-02, revisions 10-8-02, ready 10-8-02, issued 10-9-02.

Coaches Sports Bar and Cafe, interior remodel, 1036 N. Sprigg St., letter sent 8-30-02, partial revisions 9-13-02, beam calculations 9-17-02, revisions 10-2-02, needs parking addressed.

La Croix United Methodist Church, phase 3, new worship center, 3102 Lexington Ave., structural calculations 8-28-02, water calculations 1-30-08, letter sent 8-30-02.

Cape Church of God, 624 S. Ellis St., new accessible ramp, on hold by architect 5-31-02.

Williams Investments, 10 S. Spanish St., interior remodel, sent set of plans to fire department 4-2-02, letter sent 4-19-02, revisions 7-9-02, ready 7-15-02.

Craftsman Independent Union, 2709 Bloomfield Road, addition, interior remodel, MPE Plans 2-8-02, letter sent 2-21-02, partial revisions 4-5-02, ready 4-15-02.

Home Medical Supply, 52 Plaza Way, interior remodel, letter sent 2-11-02, revisions 2-13-02, letter sent 2-15-02, revisions 2-19-02, ready 2-19-02, withdrawn 10-02-02.

Bryan Young Storage Building, 721 Broadway, interior remodel, comments from the fire department 1-14-02, sent letter 2-6-02, revisions received 3-7-02, needs licensed contractor with the city of Cape Girardeau.

Mid American Title Loans, 1000 N. Kingshighway, interior remodel, ready 11-30-02.

SOURCE: Cape Girardeau Division of Inspection Services


Fact Check
See inaccurate information in this story?


Respond to this story

Posting a comment requires free registration. If you already have an account on seMissourian.com or semoball.com, enter your username and password below. Otherwise, click here to register.

Username:

Password:  (Forgot your password?)

Your comments:
Please be respectful of others and try to stay on topic.