Model bridge at contest shows the strain

Friday, November 17, 2017

The balsa-wood model bridge constructed by Sylvester Morse of Oak Ridge buckles Thursday from the weight of 63 pounds of water during the 14th annual bridge-building competition sponsored by the Missouri Department of Transportation at Rose Theater. Neal Taegtmeyer, a MoDOT transportation project designer, filled the bucket until the model failed. High-school juniors and seniors use 15 pieces of balsa wood, thread and glue to design the most efficient model bridge. The top winners include Jacob Thomure, first place, Ste. Genevieve; Taylor Bolin, second place, Oak Ridge; Jordan Weibrecht, third place, Ste. Genevieve; Connor Bock, fourth place, Oak Ridge; Trenton Gramlisch, fifth place, Chaffee.

To continue reading
For more than 115 years, the Southeast Missourian has written the first draft of local history. We have aspired to enrich, entertain, educate and inform. Our core values have remained firm: truth, service, quality, integrity and community. Support our mission.